StrataReportsStrataReportsStrataReports
    StrataReports Logo

    Empowering property buyers with professional strata and condo document reviews.

    Products

    • Strata Document ReviewVancouver·Victoria
    • Condo Document ReviewCalgary·Edmonton
    • StrataStats
    • StrataBrochure
    • StrataReports Australia

    Resources

    • Pricing
    • Help Center
    • Contact Us
    • Support
    • Blog
    • About Us

    Legal

    • Terms of Service
    • Privacy Policy

    © 2026 BLINQ Innovations Inc. All rights reserved.

    Proudly Canadian
    Report Details & Analysis

    Highlights

    Bylaws

    There are no restrictions on rentals, including short-term or commercial use, but owners must notify the Corporation and have tenants agree to comply with bylaws. Pets require prior written Board approval, and only electric or small propane barbecues are allowed, with strict safety requirements.

    Water & Leaks

    In 2025, a significant basement leak occurred due to a split exterior water line, and ongoing issues with eavestrough leaks at Unit 29 and phased underground sewer repairs were documented, with repairs and maintenance actions in progress or recently completed.

    Projects & Special Levies

    The building is actively upgrading its electrical meters and panels in 2025 to support future electric vehicle charging, with contracted vendors scheduled for ongoing work; however, no specific details on EV charger installation timelines or costs have been provided.

    Building Envelope

    The building envelope is generally performing as expected for its age, with ongoing localized repairs such as siding and eavestrough maintenance, while major restoration of cladding, windows, and roofing is planned for 2038-2040.

    Mechanical & Electrical Systems

    As of August 2025, the building is actively upgrading its electrical systems, including meter and panel replacements, to modernize infrastructure and prepare for future electric vehicle charging, while sump pumps have an estimated 5-7 years of remaining life with proactive maintenance and replacement planned.

    Legal & Civil Resolutions

    In 2025, the Board undertook a comprehensive bylaw update with legal counsel, culminating in the acceptance of a final draft and preparation for a special resolution requiring owner approval, with no specific legal disputes or costs reported.

    Bylaws

    There are no restrictions on rentals, including short-term or commercial use, but owners must notify the Corporation and have tenants agree to comply with bylaws. Pets require prior written Board approval, and only electric or small propane barbecues are allowed, with strict safety requirements.

    Water & Leaks

    In 2025, a significant basement leak occurred due to a split exterior water line, and ongoing issues with eavestrough leaks at Unit 29 and phased underground sewer repairs were documented, with repairs and maintenance actions in progress or recently completed.

    Projects & Special Levies

    The building is actively upgrading its electrical meters and panels in 2025 to support future electric vehicle charging, with contracted vendors scheduled for ongoing work; however, no specific details on EV charger installation timelines or costs have been provided.

    Building Envelope

    The building envelope is generally performing as expected for its age, with ongoing localized repairs such as siding and eavestrough maintenance, while major restoration of cladding, windows, and roofing is planned for 2038-2040.

    Bylaws

    There are no restrictions on rentals, including short-term or commercial use, but owners must notify the Corporation and have tenants agree to comply with bylaws. Pets require prior written Board approval, and only electric or small propane barbecues are allowed, with strict safety requirements.

    Water & Leaks

    In 2025, a significant basement leak occurred due to a split exterior water line, and ongoing issues with eavestrough leaks at Unit 29 and phased underground sewer repairs were documented, with repairs and maintenance actions in progress or recently completed.

    Projects & Special Levies

    The building is actively upgrading its electrical meters and panels in 2025 to support future electric vehicle charging, with contracted vendors scheduled for ongoing work; however, no specific details on EV charger installation timelines or costs have been provided.

    Building Envelope

    The building envelope is generally performing as expected for its age, with ongoing localized repairs such as siding and eavestrough maintenance, while major restoration of cladding, windows, and roofing is planned for 2038-2040.

    Mechanical & Electrical Systems

    As of August 2025, the building is actively upgrading its electrical systems, including meter and panel replacements, to modernize infrastructure and prepare for future electric vehicle charging, while sump pumps have an estimated 5-7 years of remaining life with proactive maintenance and replacement planned.

    Legal & Civil Resolutions

    In 2025, the Board undertook a comprehensive bylaw update with legal counsel, culminating in the acceptance of a final draft and preparation for a special resolution requiring owner approval, with no specific legal disputes or costs reported.

    The Timeline Narrative

    NovemberNov2024
    01 / 08
    Speed
    1x
    Click items to see more details
    Electric vehicle charging plans

    EV capacity groundwork

    Electrical upgrades were specifically planned to support future EV charging, laying the groundwork for later installation of charging stations.

    Electrical

    Electrical upgrades initiated

    The corporation began a multi‑year upgrade of common-area electrical meters and panels, with work expected to continue through 2025.

    Insurance

    2025 insurance renewed

    The Board renewed the master policy with Summit Insurance for Dec 31, 2024–Dec 31, 2025 at a $26,900 premium, slightly lower than the prior year.

    Plumbing

    Sewer camera inspection

    Drain Tech completed a sewer line camera inspection; the Board awaits the final report and plans spring review of hydrant valves and curb-stop grading.

    Press play to hear the story

    Nov
    Dec
    Jan
    Feb
    Mar
    Apr
    May
    Jun
    Jul
    Aug
    Sep
    Oct
    Dec
    Feb
    Sep
    Oct
    Nov
    Dec
    Jan
    Feb
    Mar
    Apr
    May
    Jun
    Jul
    Aug

    Unit Overview

    This Unit · Condo Lot 31
    From the Status Certificate
    Monthly Condo FeeThis unit's share of building operating costs
    $379
    Outstanding BalanceAmount currently owed to the strata
    $0
    Market Estimates
    Powered byOFFERLAND
    Estimated Monthly RentHigh confidence ·
    Nov, 2025
    $2,400
    –
    $2,600
    Recent Rentals Nearby
    Units like this one that rented recently - the basis for the rent estimate above.
    $2,475
    Nov, 2025
    126 Main Street NW, Edmonton
    2
    2
    940 sqft
    $2,440
    Sep, 2025
    118 Main Street NW, Edmonton
    2
    1
    880 sqft
    $2,520
    Aug, 2025
    134 Main Street NW, Edmonton
    2
    1
    915 sqft
    $2,590
    Jul, 2025
    150 Main Street NW, Edmonton
    2
    2
    1055 sqft
    $2,495
    Jun, 2025
    132 Main Street NW, Edmonton
    2
    1
    930 sqft
    $2,430
    May, 2025
    112 Main Street NW, Edmonton
    2
    1
    870 sqft
    $2,405
    Apr, 2025
    110 Main Street NW, Edmonton
    2
    1
    845 sqft
    $2,580
    Mar, 2025
    144 Main Street NW, Edmonton
    2
    2
    1040 sqft
    $2,460
    Feb, 2025
    120 Main Street NW, Edmonton
    2
    1
    900 sqft
    $2,415
    Jan, 2025
    116 Main Street NW, Edmonton
    2
    1
    860 sqft

    Financial

    Compared with similar nearby condos, matched on size, type, and more.

    Reserve Fund Balance
    $421,300
    Typical: $436K – $590K
    Aug 31, 2025
    Lower
    Typical
    Higher

    Insurance(Dec 2025 – Dec 2026)

    Earthquake Deductible
    $100,000
    Or
    5%
    Typical: 4% – 6%
    Lower
    Typical
    Higher
    Flood Deductible
    $25,000
    Typical: $19K – $25K
    Lower
    Typical
    Higher
    Water Deductible
    $50,000
    Typical: $28K – $37K
    Lower
    Typical
    Higher

    Budgets(Jan 2025 – Dec 2025)

    Building Budget
    $103,500
    Typical: $109K – $148K
    Lower
    Typical
    Higher
    Reserve Fund Contribution
    $92,000
    Typical: $58K – $79K
    Lower
    Typical
    Higher
    Insurance Budget
    $30,000
    Typical: $24K – $32K
    Lower
    Typical
    Higher
    Management Fee Budget
    $16,000
    Typical: $15K – $20K
    Lower
    Typical
    Higher
    Repair & Maintenance Budget
    $18,000
    Typical: $21K – $28K
    Lower
    Typical
    Higher
    Utilities Budget
    $3,800
    Typical: $4.4K – $5.9K
    Lower
    Typical
    Higher

    Meeting Minutes

    Compared with similar nearby condosThe whole section reviewed, matched on age, size and type

    The phased sewer relining programme finished its latest run in July 2026 at about $16,200, work most similar condos nearby of this era are still scoping. A split basement water line was repaired within three weeks, a lighter leak history than most nearby record, and the insurance premium eased slightly on a stable claims record. Shingles last replaced in 2008 show no active issues with replacement eight to ten years out, a longer runway than most similar condos nearby are working to. Bylaw modernization with counsel reached a final draft in May 2026, a step fewer nearby have taken. Envelope upkeep, electrical, windows and fire safety sit where most nearby do.

    Electric Vehicle Charging Plans

    Meters and panels upgraded for future charging, no chargers yet, typical nearby
    Through 2026 the building has upgraded its electrical meters and panels with the stated goal of supporting future EV charging, involving several vendors and consultants, with work ongoing as of mid-2026. There are still no details on charger counts, timelines, or costs. The project remains in the readiness phase, with no committed charger installations yet.

    Insurance

    Premium eased slightly on a stable claims record, in line with most nearby
    The master policy was renewed for 2026 with a slight premium decrease on a stable claims history, and earthquake, flood, and water deductibles are unchanged. An annual appraisal was scheduled for mid-2026. Owners must insure their own interiors and personal property—as seen after the July 2026 water leak—and confirm their policies cover the corporation's deductibles. Coverage is current and stable as of mid-2026.

    Leaks

    Basement line repaired within three weeks, lighter history than most nearby
    A split water line caused a basement leak on July 30, 2026, with repairs finished by August 21, 2026; owners cover interior damage through their own insurance. Eavestrough leaks at the rear of Unit 29, noted since January 2026, have approved repairs still pending as of mid-2026. Prompt attention is needed to avoid further drainage issues, but no major financial or legal implications have been reported.

    Building Envelope

    Siding repair at $1,880 and seam painting only, less spending than most nearby
    Envelope upkeep includes siding repairs at Unit 13 (approved July 2026 for $1,880 plus GST) and periodic painting of Hardie Board seams. Eavestrough leaks at Unit 29 are scheduled for repair, with spring cleaning completed in April 2026. A long-term envelope restoration is planned for the late 2030s per the Reserve Fund Study. No major unresolved issues beyond routine maintenance were noted.

    Roof

    2008 shingles sound, replacement eight to ten years out, later than nearby
    The roof shingles were last replaced in 2008, making them roughly 18 years old as of 2026. There are no current issues, but a full shingle replacement is projected within about 8-10 years, as identified in the March 2026 Reserve Fund Study—a planned future capital project listed in the study.

    Windows

    Basement window renewals phased from 2027, similar timing to most nearby
    Phased basement window and well renewals are set to begin in 2027, with broader window and well replacements planned for 2026-2030 per the Reserve Fund Study. The scope may be affected by ongoing fencing and grading work, but no specific costs or detailed timelines were set as of the latest 2026 meetings.

    Plumbing

    Sewer relining finished July 2026 at $16,200, further along than most nearby
    The building completed significant plumbing work in 2026, including a phased sewer relining program to fix recurring backups, with the latest project finished in July 2026 (~$16,200). Final surface restoration and grading for curb-stop valve access remain pending, with quotes under review. A freeze-related basement leak in July 2026 was repaired, though owners cover interior damage. Hydrant and curb-stop valve access is reviewed regularly.

    Mechanical Systems

    Drainage and valve access upkeep only, no capital items open, typical nearby
    The Board ran a phased sewer-line repair and relining program to resolve recurring backups, with major repairs and inspections done as of July 2026 and final surface restoration still pending. Ongoing maintenance covers curb-stop valve access, drainage grading, sump pump upkeep, and planned eavestrough repairs. No significant financial or legal concerns beyond standard maintenance were noted.

    Electrical

    Panels upgraded to code with charging readiness, work most nearby still plan
    The building has upgraded common-area meters and panels through 2026 for code compliance and future EV readiness, working with specialized vendors and EV consultants. Charger installation is not yet scheduled, but the upgrades position the building for future adoption. Costs aren't disclosed, though the reserve fund is reported healthy enough to support the work, with no major issues identified.

    Fire Safety

    Annual hydrant inspection scheduled, routine as at most nearby condos
    The Board maintains fire safety with an annual fire hydrant inspection by Prairie Fire Services scheduled for September 2026, following recent landscaping, plus a spring review to keep hydrant valve access clear. These are standard compliance and maintenance actions, with no significant financial or legal concerns noted.

    Legal And Civil Resolution

    Bylaw modernization drafted with counsel, fewer nearby have undertaken this
    In 2026 the Board began a comprehensive bylaw modernization with legal counsel, updating governance and addressing issues like parking enforcement. The Board accepted the final draft on May 29, 2026, and a special resolution for owner approval will follow. No legal disputes or financial implications were noted; the aim is to align the bylaws with current legislation and best practice.

    Engineering & Reserve Fund Study

    Compared with similar nearby condosThe whole section reviewed, matched on age, size and type

    The reserve fund study puts underground water and sanitary replacement within two to four years against a $55,000 allowance, sooner than most similar condos nearby of this era are planning that work. Basement aluminum windows are at end of life with phased replacement in 2027 and 2029, while the study rates the main floor units good with a decade or more left. Full envelope restoration is not scheduled until 2038 to 2040, a longer horizon than most nearby carry. The shingles' remaining eight to ten years, the 2029 hydrant replacement and the structural, mechanical and electrical items all sit where most similar condos nearby do.

    Building Envelope

    Stucco rated fair, restoration not due until 2038, longer horizon than nearby
    The building envelope, composed of stucco and siding, is in fair condition with minor deficiencies being addressed. A full restoration of the envelope, including cladding, windows, and roofing, is scheduled for 2038-2040. Routine maintenance for sealants, drainage, decks, and walkways is ongoing. No major structural or thermal issues have been reported, and the envelope is performing as expected for its age.
    Related Updates from Council
    In Progress
    • Siding repair at Unit 13 (approx. $1,880) and repainting of exposed Hardie Board seams were approved in Jul 2025 and work is now underway to correct minor cladding defects highlighted in the engineering report.
    Planned
    • The Board has approved, but not yet scheduled, repairs to the leaking eavestrough at the rear of Unit 29 to restore proper exterior drainage as recommended for the building envelope.
    • Roof shingle replacement is budgeted for roughly 2033-2035 (8-10 years from 2025) to address the 17-year-old roof before it reaches the end of its service life.
    • Phased replacement of basement windows and their wells is set to start in 2027 to keep the envelope weathertight and reduce moisture risks, following the Reserve Fund Study.
    Related Updates from Council
    In Progress
    • Siding repair at Unit 13 (approx. $1,880) and repainting of exposed Hardie Board seams were approved in Jul 2025 and work is now underway to correct minor cladding defects highlighted in the engineering report.
    Planned
    • The Board has approved, but not yet scheduled, repairs to the leaking eavestrough at the rear of Unit 29 to restore proper exterior drainage as recommended for the building envelope.
    • Roof shingle replacement is budgeted for roughly 2033-2035 (8-10 years from 2025) to address the 17-year-old roof before it reaches the end of its service life.
    • Phased replacement of basement windows and their wells is set to start in 2027 to keep the envelope weathertight and reduce moisture risks, following the Reserve Fund Study.

    Roof

    2008 shingles with eight to ten years left, similar runway to most nearby
    The roof is covered with fibreglass laminate shingles that are about 17 years old as of March 2025, with an estimated 8-10 years of life remaining. Minor age-related wear has been noted, but no active leaks are present and localized repairs have been completed. Full roof replacement is scheduled for 2033-2035, and repairs to eavestroughs and downspouts are planned to coincide with this work, with additional repairs expected within the next 5-10 years. These are standard reserve fund maintenance plans and do not indicate urgent issues.
    Related Updates from Council
    Planned
    • At the May 2025 AGM, the board confirmed they plan to replace all roof shingles and carry out related eavestrough/downspout repairs in roughly 8–10 years (target 2033-2035) as called for in the 2025 Reserve Fund Study.
    Related Updates from Council
    Planned
    • At the May 2025 AGM, the board confirmed they plan to replace all roof shingles and carry out related eavestrough/downspout repairs in roughly 8–10 years (target 2033-2035) as called for in the 2025 Reserve Fund Study.

    Windows

    Basement aluminum at end of life, phased 2027 and 2029, earlier than nearby
    Main floor PVC windows are about 15 years old and in good condition, with 10-15+ years of expected life remaining. Basement aluminum windows are original and nearing end of life, with phased replacements scheduled for 2027 and 2029, alongside window well replacements. A $6,000 allowance is recommended for window repairs, and ongoing maintenance of sealants and drainage is advised. These planned replacements may have financial implications for future owners.
    Related Updates from Council
    In Progress
    • As of Mar 2025, the Board is refining the fencing and grading contract to ensure any necessary drainage work is done in tandem with the upcoming basement window replacements, so the new windows are protected from water issues highlighted in the Reserve Fund Study.
    Planned
    • At the AGM in May 2025, the Board approved phased replacement of the original basement windows and their steel window wells starting in 2027, resolving the end-of-life condition noted in the engineering report.
    Related Updates from Council
    In Progress
    • As of Mar 2025, the Board is refining the fencing and grading contract to ensure any necessary drainage work is done in tandem with the upcoming basement window replacements, so the new windows are protected from water issues highlighted in the Reserve Fund Study.
    Planned
    • At the AGM in May 2025, the Board approved phased replacement of the original basement windows and their steel window wells starting in 2027, resolving the end-of-life condition noted in the engineering report.

    Structural

    Wood frame reported sound in the 2025 study, no faults noted, typical nearby
    As of the March 31, 2025 reserve fund plan, the 2-storey wood-frame buildings (constructed in the late 1970s) show no reported structural faults or cracks. Key structural elements such as foundations, footings, and load-bearing walls are not flagged for concern, and the complex is described as well maintained with proactive management. No major structural issues or future structural projects are noted.
    Related Updates from Council
    In Progress
    • As of Jul 2025 the board approved a $1,880 contract to repair damaged siding at Unit 13, directly addressing envelope deterioration noted in maintenance reports.
    • Painting of Hardie Board seams around the complex is underway through 2025 to seal joints and prevent moisture intrusion into the building envelope.
    Planned
    • Management is securing quotes to fix the leaking rear eavestrough at Unit 29 (identified in Apr 2025), with repairs to proceed once pricing and timing are confirmed.
    • The 2026-2030 Reserve Fund Study sets aside funds to replace all roof shingles in about 8-10 years to maintain roof integrity as the current shingles near the end of their service life.
    Related Updates from Council
    In Progress
    • As of Jul 2025 the board approved a $1,880 contract to repair damaged siding at Unit 13, directly addressing envelope deterioration noted in maintenance reports.
    • Painting of Hardie Board seams around the complex is underway through 2025 to seal joints and prevent moisture intrusion into the building envelope.
    Planned
    • Management is securing quotes to fix the leaking rear eavestrough at Unit 29 (identified in Apr 2025), with repairs to proceed once pricing and timing are confirmed.
    • The 2026-2030 Reserve Fund Study sets aside funds to replace all roof shingles in about 8-10 years to maintain roof integrity as the current shingles near the end of their service life.

    PlumbingIMPORTANT

    Underground services due within two to four years, sooner than most nearby
    The building's underground water and sanitary plumbing services are projected to need replacement within 2-4 years (as of Mar 31, 2025), with a reserve allowance of $55,000. Camera inspections (2023-2025) found areas needing future relining, and ongoing inspections every 3-5 years are advised. Repairs should be coordinated with asphalt replacement around 2030. Minor drainage grading issues are being addressed, but re-grading is recommended. There is a possibility of special levies later in the decade if actual costs exceed estimates.
    Related Updates from Council
    Completed
    • A phased sewer relining project between two townhouse blocks was finished in July 2025, fixing damaged underground pipes and stopping recurring backups identified in the engineering reports.
    • Reliable Mechanical repaired a split exterior hose bib and water line on Aug 21 2025 after a freeze-related leak, addressing a plumbing vulnerability and stopping further water intrusion into a unit basement.
    In Progress
    • The Board is arranging final asphalt patching and drainage re-grading over the repaired sewer trench, with quotes under review since Aug 2025, to ensure water drains away from the buildings and to keep curb-stop valves accessible.
    Planned
    • Seasonal grading and shrub removal are scheduled for spring to keep curb-stop and hydrant control valves exposed for quick shut-off access, preventing future burial issues noted in the reports.
    • Sewer camera inspections will continue on a 3-5-year cycle, with the next inspection expected by 2028, to track the remaining life of the underground plumbing and decide when full replacement is needed.
    Related Updates from Council
    Completed
    • A phased sewer relining project between two townhouse blocks was finished in July 2025, fixing damaged underground pipes and stopping recurring backups identified in the engineering reports.
    • Reliable Mechanical repaired a split exterior hose bib and water line on Aug 21 2025 after a freeze-related leak, addressing a plumbing vulnerability and stopping further water intrusion into a unit basement.
    In Progress
    • The Board is arranging final asphalt patching and drainage re-grading over the repaired sewer trench, with quotes under review since Aug 2025, to ensure water drains away from the buildings and to keep curb-stop valves accessible.
    Planned
    • Seasonal grading and shrub removal are scheduled for spring to keep curb-stop and hydrant control valves exposed for quick shut-off access, preventing future burial issues noted in the reports.
    • Sewer camera inspections will continue on a 3-5-year cycle, with the next inspection expected by 2028, to track the remaining life of the underground plumbing and decide when full replacement is needed.

    Mechanical Systems

    Sump pumps with five to seven years left, ordinary for nearby condos
    The building's mechanical systems include sump pumps with an estimated remaining life of 5-7 years as of March 31, 2025. A reserve fund allocation of over $5,000 is set aside for their future replacement, and proactive maintenance and replacement are recommended to minimize flood risk. No other major mechanical systems (heating, cooling, HVAC, or boilers) were noted in the report.
    Related Updates from Council
    In Progress
    • As confirmed at the May 2025 AGM, the Board is carrying out routine sump-pump inspections and maintenance to keep the pumps working and lower flood risk, as recommended in the Engineering Report.
    Planned
    • The Reserve Fund Study (Mar 2025) sets aside roughly $5,000 to replace the building’s sump pumps within the next 5–7 years, so the pumps will be swapped out before they reach end-of-life.
    Related Updates from Council
    In Progress
    • As confirmed at the May 2025 AGM, the Board is carrying out routine sump-pump inspections and maintenance to keep the pumps working and lower flood risk, as recommended in the Engineering Report.
    Planned
    • The Reserve Fund Study (Mar 2025) sets aside roughly $5,000 to replace the building’s sump pumps within the next 5–7 years, so the pumps will be swapped out before they reach end-of-life.

    Electrical

    Meters and panels being replaced for code and charging, common upgrade nearby
    As of March 31, 2025, the building's electrical systems are being upgraded, including meter and panel replacements and vendor inspections. These improvements are part of a modernization plan to support future electric vehicle (EV) charging expansion. No current issues have been reported, and the electrical infrastructure is in good condition with ongoing upgrades.
    Related Updates from Council
    In Progress
    • The condo is actively replacing and upgrading common-area electrical meters and panels (work ongoing through Aug 2025) to modernize the system and handle future EV-charging loads, as recommended in the Reserve Fund Study.
    Planned
    • A specialized EV-infrastructure contractor is evaluating the site and preparing designs for future electric-vehicle chargers; installation will proceed once the current electrical upgrades are finished.
    Related Updates from Council
    In Progress
    • The condo is actively replacing and upgrading common-area electrical meters and panels (work ongoing through Aug 2025) to modernize the system and handle future EV-charging loads, as recommended in the Reserve Fund Study.
    Planned
    • A specialized EV-infrastructure contractor is evaluating the site and preparing designs for future electric-vehicle chargers; installation will proceed once the current electrical upgrades are finished.

    Fire Safety

    Hydrant replacement budgeted 2029 at $31,000, routine among nearby condos
    The on-site fire hydrant is scheduled for replacement in 2029 at an estimated cost of $31,000, with annual inspections ongoing to ensure compliance. Additionally, the condominium corporation is updating bylaws to strengthen barbecue and fire safety restrictions. These measures reflect proactive fire safety management and planned capital expenditures within the next 5 years.
    Related Updates from Council
    Planned
    • The Board has scheduled the required annual inspection of the on-site fire hydrant with Prairie Fire Services for September 2025, meeting the engineering recommendation for yearly hydrant testing.
    • The Board will review and clear vegetation around the hydrant valve in spring 2026 to ensure easy access for maintenance and emergencies, following up on fire-safety maintenance needs identified in recent meetings.
    Related Updates from Council
    Planned
    • The Board has scheduled the required annual inspection of the on-site fire hydrant with Prairie Fire Services for September 2025, meeting the engineering recommendation for yearly hydrant testing.
    • The Board will review and clear vegetation around the hydrant valve in spring 2026 to ensure easy access for maintenance and emergencies, following up on fire-safety maintenance needs identified in recent meetings.

    Bylaws

    Compared with similar nearby condosThe whole section reviewed, matched on age, size and type

    Renting here is unrestricted, short-term stays included, more open than most similar condos nearby that ban stays under 30 days. Pets need written Board approval that can be withdrawn on 15 days' notice, narrower than the fixed allowances most nearby publish. Barbecue and renovation rules sit where most similar condos nearby do.

    Rental Restriction

    No cap, approval or short-term ban, more open than most nearby
    There are no restrictions on the number or type of units that may be rented, including short-term or vacation rentals. Owners must notify the Corporation of any tenancy and have tenants sign an agreement to follow the bylaws. No Board approval or minimum lease term is required. These rules have stood since June 3, 1985, with no proposed changes.

    Pet RestrictionIMPORTANT

    Pets only by revocable Board approval, narrower than most nearby allow
    Pets are not allowed in any unit or on common property without prior written Board approval, which can be revoked on 15 days' notice. No pets may run at large on common property. There are currently no pet-related fees or levies.

    Barbecue Guidelines

    Electric or small propane only, gas and charcoal banned, common rule nearby
    Gas and charcoal barbecues are banned on decks, balconies, and patios for fire and insurance reasons; only electric or small propane units are allowed, with adequate clearance and a fire extinguisher required. Propane cylinders may not be stored indoors or in enclosed spaces. Non-compliance may bring fines or removal of equipment.

    Renovation Rules

    Board approval with permits and 8 to 8 hours, standard among nearby
    Interior renovations affecting plumbing, electrical, structural elements, or the envelope require prior Board approval, plus plans, contractor details, and proof of permits and insurance. Work is limited to 8:00 a.m.–8:00 p.m. and must not disturb residents, and owners are liable for any common-property damage and related insurance costs.
    Report Sources
    Below are the documents used to generate this report. Click on any available document to view it directly.
    Status Certificate1 file available
    Insurance Documents1 file available
    Bylaws1 file available
    Engineering ReportsNot detected
    Declaration of CorporationNot detected
    Future Funding of the Reserve Fund Plan1 file available
    Meeting Minutes
    Available
    Not Available
    2024
    |
    2025
    Jan
    Feb
    Mar
    Apr
    AGM
    May
    Jun
    Jul
    Aug
    Sep
    Oct
    Nov
    Dec

    StrataReports provides detailed condo and strata document analysis to aid in informed decision-making. Users, including real estate professionals and home buyers, should rely on their own judgment and seek professional advice when necessary. Our platform is an informational tool, not a substitute for professional guidance. Please consult our Terms of Service for more information.

    Major Work Ahead

    Next 6 years · based on the engineers' review from
    Mar, 2025
    About $472K of suggested work, spread across 6 years.
    2026Equipment
    ~$8KPaid from the fund
    2027Windows & Doors, Plumbing
    ~$58KPaid from the fund
    2028Plumbing
    ~$55KPaid from the fund
    2029Windows & Doors, Fire Protection, Plumbing
    ~$81KPaid from the fund
    2030Site & Landscaping, Plumbing
    ~$260KNeeds a $150K special assessment
    2031Plumbing
    ~$10KPaid from the fund
    How will this be paid for?Buildings save up for work like this through the owners' monthly fees, which go into a shared fund (the reserve fund). The engineers' review lays out how to make sure there's enough money in it.